EXIM Bank of China : Kandy North Pathadumbara Integrated Water Supply Project - Loan Agreement 2017
Date
2017-12-12Author
EXIM Bank of China (Lender)
Ministry of Finance (Borrower)
Metadata
Show full item recordAbstract
Included here are contract documents related to the Kandy North Pathadumbara Integrated Water Supply Project dated 2017.12.12 - China EximBank GCL No. (2017) 07 Total No. (612). The project was executed by the Ministry of City Planning and implemented by National Water Supply and Drainage Board (NWSDB). The funder for this project was EXIM Bank of China and the contractor was Sinohydro Corporation.
Note
Description
The loan documents were obtained through a Right To Information - RTI request by Verite Research. Included here is the loan agreement which consists of 38 pages.
Collections
- Loan Agreements [19]
Related items
Showing items related by title, author, creator and subject.
-
Japan International Cooperation Agency (JICA) : Anuradhapura North Water Supply Project (Phase 02) - Loan Agreement 2016
Japan International Cooperation Agency (Lender); Ministry of Finance (Borrower) (2016-11-17)Included here are loan documents related to the Anuradhapura North Water Supply Project (Phase 02) dated 2016.11.17 - No. SL - P115. The project was executed by the Ministry of Water Supply and implemented by National Water ... -
Export-Import Bank of Korea : Deduru Oya Water Supply Project - Contract Agreement 2016
National Water Supply and Drainage Board; Ministry of City Planning and Water Supply (Colombo: Ministry of City Planning and Water Supply, 2016-12-23)Included here is the contract document related to the Deduru Oya Water Supply Project dated 2016.12.23 - P&D/DOWSP/EDCF/W/DB/2014/01. The project was executed by the Ministry of City Planning and Water Supply and implemented ...