• Login
    View Item 
    •   VR-IKR Home
    • Public Infrastructure Project Contracts and Loan Agreements
    • Procurement Contracts
    • View Item
    •   VR-IKR Home
    • Public Infrastructure Project Contracts and Loan Agreements
    • Procurement Contracts
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Japan International Cooperation Agency (JICA) : Habarana Veyangoda Transmission Project - Contract Agreement 2016

    Thumbnail
    View/Open
    Habarana Veyangoda Transmission Project Contract (1.809Mb)
    Date
    2016-11-04
    Author
    Ministry of Power
    Ceylon Electricity Board (CEB)
    Metadata
    Show full item record
    Abstract
    Included here are contract documents related to the Habarana Veyangoda Transmission Project dated 2016.11.04 - PD/TCO/FST/8/13. The project was executed by Ministry of Power and Energy and implemented by the Ceylon Electricity Board (CEB). The funder for this project was the Japan International Cooperation Agency (JICA) and the contractors were Mitsubishi Corporation, J Power Systems Corporation, Siemens Limited and Ceylex Engineering.
    Note
    Description
    The contract documents were obtained through a Right To Information - RTI request by Verite Research. Included here is the contract agreement which consists of 12 pages.
    URI
    http://archive.veriteresearch.org/handle/123456789/4842
    Collections
    • Procurement Contracts [21]

    Related items

    Showing items related by title, author, creator and subject.

    • Japan International Cooperation Agency (JICA) : National Transmission and Distribution Network Development and Efficiency Improvement Project - Contract Agreement 2018 

      Ministry of Power; Ceylon Electricity Board (CEB) (2018-11-15)
      Included here is the contract document related to the National Transmission and Distribution Network Development and Efficiency Improvement Project dated 2018.11.15 - CEB/NTDND&EIP. The project was executed by Ministry of ...
    • Sudath Samaraweera: Community transmission 

      FactCheck;P0016
      FactCheck
      (www.factcheck.lk, 12/11/2020)
      FALSE: “If positive cases are reported without the origin, then it can be identified as a community transmission. In other words, community transmission takes place when cases are reported with no connection to the existing ...
    • Pavithradevi Wanniarachchi: Covid-19 community transmission 

      E650;
      FactCheck
      (www.factcheck.lk, 6/4/2020)
      TRUE: …No [COVID-19] patients were reported from the community in the period of close to three weeks that elapsed, because the disease did not spread amongst the community. - Pavithradevi Wanniarachchi, Ada Derana, 20 May 2020

    • Verité Research Institutional Knowledge Repository copyright © 2018-2020  Verité Research
    • DSpace software copyright © 2002-2020  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of VR-IKRCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    • Verité Research Institutional Knowledge Repository copyright © 2018-2020  Verité Research
    • DSpace software copyright © 2002-2020  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV